
中央熱泵適合您的住宅嗎?
- 您家已有風管中央熱泵利用您現有的風管,把暖氣和冷氣送到每個房間。
- 您的暖爐(Furnace)快要更換既然暖爐本來就要換,這正是轉換系統的好時機。
- 您也想要冷氣同一套系統在夏天製冷,不用另外購買冷氣機。
- 您想停用煤氣熱泵用電運作,煤氣暖爐便可以拆除。
- 您的冷氣機也已老舊一部熱泵可以同時取代暖爐和冷氣機。
家中沒有風管?無風管分體式冷暖機(Ductless Mini Split)可以逐個房間做到同樣的效果。
中央熱泵如何運作
熱泵(Heat Pump)的原理是搬運熱力,而不是燃燒燃料來產生熱力。冬天,它從室外空氣中吸取熱力帶進室內;夏天則反向運作,把室內的熱力帶走。室內風櫃(Air Handler)是把空氣推進風管的風機裝置,它會把空氣送到每個房間,與您現在的暖爐一樣。
熱泵分為兩種。一般熱泵在 -15°C 時只能發揮約 70% 的製熱能力,不足之處要靠電輔熱(Strip Heater)補上。電輔熱是一種電熱元件,運行成本約為熱泵本身的三倍。寒冷氣候熱泵(Cold-Climate Heat Pump)在 -15°C 時仍能保持全部製熱能力。Hitachi 把旗下的寒冷氣候技術稱為 HeatForce,您也可能見到 HyperHeat 這個名稱:兩者是同一回事,都是寒冷氣候技術。
根據《加拿大國家建築規範 2020》(National Building Code of Canada 2020),大溫地區的冬季設計溫度約為 -7°C,即計算本地暖氣系統容量時所依據的室外溫度。哪一種熱泵適合您的住宅,要看您在寒流期間願意在多大程度上依賴電輔熱。我們會在估價時與您一起比較。
您的選擇
兩個級別的容量計算和安裝方式完全相同,分別在於各自的設備系列。
高級
Hitachi、Panasonic、Fujitsu
日本製造商的設備,包括寒冷氣候型號。如果熱泵將是您唯一的暖氣來源,又希望在寒流中有最充足的製熱能力,可選這一級。
實惠
Midea
透過風管供暖及製冷的較低價選擇。
起價
以下為起價,另加 GST。免費上門估價後,我們會以書面提供您的實際價格。
暖氣及冷氣
- 中央熱泵(Central Heat Pump)$14,150
已包括標準電力連接。如您的住宅需要電力服務升級(Electrical Service Upgrade),會另行報價。最終價格會在開工前以書面確認。所有起價均另加 GST。
可透過 FinanceIt 分期付款,免費上門估價時會為您介紹各個方案。
預約安裝時,我們收取 50% 訂金。CleanBC 補貼工程及物業管理(Strata)住宅的工程則先收 $1,000 訂金,待所有審批完成後,再補足至 50% 訂金。距離安裝日一星期以前,只要尚未開工,訂金可全數退還。
您可能符合的補貼
適用哪一項補貼(Rebate),取決於您的住宅現在用甚麼供暖。CleanBC 適用於由煤氣暖氣轉用熱泵。BC Hydro 的補貼只適用於目前以電力供暖的住宅,熱泵取代煤氣暖氣時一律不適用。
每項熱泵安裝都包括
- 設備及安裝人工
- 按您的住宅選定容量;如由其他類型的系統轉換,會製作熱負荷報告(Heat Load Report)
- 每項工程都會申請許可證(Permit)及安排檢驗
- 如工程需要,由我們安排及預約持牌電工
- 標準電力連接
- 協助您處理所符合補貼的申請文件
- 如您住在 Townhouse(聯排屋)或公寓(Condo),為您的物業管理委員會(Strata Council)準備審批文件
- 安裝後跟進:大部分安裝以電話跟進,較大型或較複雜的系統會再上門檢查
- 標準 3 年人工保修(Labour Warranty)
- 如您的住宅需要電力服務升級,會另行報價。
- 熱負荷報告由我們安排獨立能源顧問(Energy Advisor)製作,並在發票上單獨列出。
- 如室內風櫃須從閣樓遷出,興建儲物間、石膏板及油漆工程並不包括在內。
我們如何為中央熱泵選定容量
一部中央熱泵透過風管為全屋供暖,所以要按整體熱負荷(Block Load)選定容量:即在冬季設計溫度下,整間房屋流失的熱量,以一個總數計算。
如您要轉換系統類型,例如由煤氣暖爐改用熱泵,這個數字來自獨立第三方能源顧問製作的熱負荷報告。報告由我們安排,並在發票上單獨列出。熱負荷報告包括甚麼(英文)
如以熱泵更換熱泵,我們會根據現有系統的表現,加上經驗來選定容量,絕大多數情況都準確無誤。如工程處於臨界情況,或您希望有十足把握,我們仍可能建議製作報告。
由預約到安裝後跟進
免費上門估價
您的家居舒適顧問會查看您的風管、電箱,以及室外機可以安裝的位置。如您住在 Townhouse 或公寓,顧問也會為每個設備位置拍照,用於物業管理審批文件。
熱負荷報告及電箱評估
如您由其他類型的系統轉換,能源顧問會製作熱負荷報告。您把 BC Hydro 的用電數據發送給我們,由我們的持牌電力承辦商評估您的電箱。
報價及安排日期
您會收到書面報價。一般工程支付 50% 即可預約安裝日期。物業管理住宅及 CleanBC 工程先收取 $1,000 可退還訂金,待申請或審批完成後,再補足至 50% 訂金並預約安裝日期。
安裝
熱泵安裝通常需時兩天。我們會申請許可證,並在需要時安排電工。安裝完成後才支付餘款。
安裝後跟進
安裝後我們會跟進:大部分住宅以電話跟進,較大型或較複雜的系統會再上門檢查。
最長 12 年人工保修
標準 3 年,可選購延長至最長 12 年。
出售住宅時可轉讓
如您出售住宅,人工保修可轉讓給新業主。這項人工保修會令物業增值,而不會白白失去。
所有人工保修,無論年期長短,均須每年由 Jolly Heating & Cooling 進行保養檢查,方可維持有效。
客戶怎樣說
評分 5 / 5
I recently had a new heat pump installed by Jolly, and the entire experience was truly exceptional from start to finish. Every person I interacted with gave me confidence that I’d made the right choice.
From the very beginning, Thomas, the sales rep, stood out.
閱讀全文收起
While other companies left me feeling either overcharged or unsure about their expertise, my conversations with Thomas were clear, respectful, and genuinely helpful. He made me feel valued as a customer, and that made a huge difference in my decision.
Jason, who coordinated the project, kept everything running smoothly behind the scenes. Scheduling, communication, permits, calculations, and follow-through were all seamless.
Wilson, the project manager, went above and beyond. He provided a thorough walkthrough of the entire system, showed me how to use all of the features, and made sure every detail met my expectations before wrapping up. His professionalism and patience were outstanding.
The quality of the work speaks for itself, everything was done to the highest standard. I couldn’t be happier with the final product, and I’m grateful to the whole Jolly team for making the process so easy and stress-free.
Highly recommended
評分 5 / 5
We recently hired Jolly Heating & Cooling to install a new heat pump system, replacing our gas furnace. After collecting quotes from four different companies, we confidently chose Jolly Heating & Cooling based on their exceptional transparency and professionalism.
Our initial experience with Thomas set the standard: he was honest, professional, and delivered completely transparent pricing, which we truly appreciated.
閱讀全文收起
The outstanding service continued throughout the entire process; Jason was professional and efficient, quickly answering all our follow-up questions.
What truly impressed us and provided immense peace of mind was the final stage: Wilson, the project manager, personally attended the post-installation walk-through. He ensured we understood exactly how to operate the new system. This level of dedication is rare.
I will enthusiastically and without reservation recommend Jolly Heating and Cooling to anyone in need of quality HVAC installation and service!
評分 5 / 5
My heat pump was installed by Jolly a few weeks ago and I couldn’t be happier with the system. The heat pump is a nice upgrade to my home and the customer service provided by Jolly was exceptional. I would absolutely recommend Jolly!
閱讀全文收起
Thomas and Jason were beyond helpful in applying for the rebates, completing my strata application, and answering the infinite questions that I had. Wilson installed my heat pump and went above and beyond to make sure that it was installed flawlessly.
常見問題
我可以保留煤氣暖氣作為後備嗎?
可以。這就是雙燃料系統(Dual Fuel):一般熱泵配搭高效煤氣暖爐(Gas Furnace),天氣轉冷時由暖爐接手供暖。製冷仍然全部由熱泵負責。
我的暖爐裝在閣樓,新的室內風櫃要裝在哪裡?
現行卑詩省建築規範已不准把室內風櫃裝在閣樓,所以我們會把它遷到二樓一個獨立的設備間。舊機是否從閣樓拆走,由您決定。
興建儲物間、石膏板及油漆工程不屬於我們的安裝範圍。
我要更換煤氣暖爐,BC Hydro 的補貼適用嗎?
不適用。BC Hydro 的補貼只適用於目前以電力供暖的住宅。由煤氣轉用熱泵,屬於 CleanBC 的範圍。
補貼金額視乎資格及計劃資金而定。我們會在免費上門估價時,為您確認可申請的補貼。
安裝需時多久?
通常兩天。我們會在報價時確認安裝時間表。
熱泵需要甚麼保養?
每年一次保養檢查(Tune-up)。如果熱泵由我們安裝,每年由 Jolly 進行保養檢查,也是人工保修維持有效的條件。不是我們安裝的熱泵,我們同樣提供保養服務。維修及保養服務只提供英語。